Signal at Stillwater  Contributor's Pick!       
Prior to CP takeover, the double track south of Binghamton extended through Conklin, almost to the PA line. The approach signal for the end of this segment was at Stillwater Rd at the far south end of Conklin. RPPY approaches at 10 MPH, slowly making its way toward Pennsyvania.
Date: 1/6/1990 Location: Conklin, NY Views: 537 Collection Of:   Tom Beckett
Locomotives: NS 6113(SD40-2) NS 3269(SD40-2) NS 6116(SD40-2) NS 8072(C30-7)    Author:  Tom Beckett
Signal at Stillwater
Picture Categories: Winter,Signal,Action This picture is part of album:  NYSW operating the D&H Binghamton south
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4369248